Drying Floor Lofts

InteriorNO. 11 / 12STATUS Built
ABCDE±0.000GROUND+6.100RIDGESOUTH ELEVATION1:500125 M
Location
Montréal, Canada
Year
2022
Area
1 150 m²
Typology
Interior
Status
Built
Client
Lachine Mill Co-op
Team
Amélie Roy, Priya Nair

The drying floor has 5 m ceilings and windows on both sides. Each loft is a single room with a timber box in it for everything that needs a door.

The site in Montréal set the terms before we drew anything. A deep plan with heavy timber posts on a tight grid. Walls go where the posts allow.

Kitchens and bathrooms stack inside the boxes so the perimeter stays clear.

We worked from a 1:50 model for most of the design stage and kept it on site through construction. Where the model and the drawings disagreed, the model usually won.

01Views

[05]

Drag, or use the arrow keys

01 / 05

02Drawings

Scroll to draw

Plan and section

The same two sheets the builder worked from, redrawn at presentation weight.
ABCDE123KITCHEN15.1 M²OFFICE15.1 M²ATELIER19.4 M²SHOWROOM19.4 M²MEETING15.1 M²LIBRARY15.1 M²STORE13.0 M²WC13.0 M²AAGROUND FLOOR PLAN1:500125 MN4 2005 4004 2003 60017 4003 6003 6007 200
FIG. 02 — GROUND FLOOR PLAN1:50
OAK VENEER, MATT LACQUERLIMEWASH PLASTERGLAZED TILE 150 × 150INTERIOR ELEVATION 021:200125 M1 2001 2002 4003 0006001 500900
FIG. 03 — INTERIOR ELEVATION 021:20

03Drawn and built

Drag the handle
ABCDE±0.000GROUND+6.100RIDGESOUTH ELEVATION1:500125 M
DrawingBuilt view

04Materials

[04]

timber

M1

Birch plywood

Service boxes, clear-oiled.

brick

M2

Existing brick

Cleaned, not sealed.

metal

M3

Blackened steel

Stairs and mezzanine edges.

concrete

M4

Screed

New floors over acoustic build-up.

05Credits

Architect
Arch Studio
Project team
Amélie Roy, Priya Nair
Structure
Holt Lundgaard Engineers
Landscape
Arch Studio Landscape
Contractor
Nordby Byg
Images