Skip to content

Site notesDATE 21 JUL 2026READ 9 min

Notes from the Nine Lights site

Fourteen months of weekly site visits, written up: what went to plan, what did not, and what we would draw differently.

FIG. 01 — Fonderie Nord Offices, SECTION A–A1:200

Author
Hana Okafor
Published
21 JUL 2026
Category
Site notes
Project
Fonderie Nord Offices

We are asked, fairly often, why a studio with good computers still begins every project with a soft pencil and a roll of thin paper. The honest answer is speed. A line on paper costs nothing, so you draw fifty of them, and the forty-nine wrong ones teach you what the right one has to do.

A sentence can leave things out. “The living room opens to the garden” sounds finished. Draw it and you have to decide how wide the opening is, what holds up the wall above it, where the step goes and which way the door swings. The drawing asks every question the sentence avoided.

The section comes first

Most people start with a plan, because a plan looks like a map and maps are familiar. We start with the section. It shows the things that make a room feel the way it does: how high the ceiling is, where the light enters, how the floor meets the ground outside.

On Fonderie Nord Offices the first drawing that survived was a section about the width of a hand. It showed one roof, one window and one person. Everything that came later was an argument with that sketch, and the building that stands in Montréal is still recognisably it.

“A line on paper costs nothing, so you draw fifty of them. The forty-nine wrong ones teach you what the right one has to do.”

Hana Okafor, Associate, project architect

What a drawing has to carry

A working drawing is an instruction to someone you may never meet. It has to survive being photocopied, folded, rained on and read at arm's length on a scaffold. That is why the conventions matter:

  • What is cut is drawn heavy; what is seen beyond is drawn light.
  • Dimensions run in chains, so nobody has to add up on site.
  • Every grid line has a name, and every sheet uses the same ones.
  • Levels are given from one datum, written on the drawing.
ABCDEFG1234OPEN OFFICE110.9 M²MEETING 0260.5 M²CORE79.2 M²MEETING 0195.0 M²STORE43.2 M²PRINT51.8 M²WC36.0 M²WC43.2 M²WC43.2 M²STUDIO110.9 M²LOBBY110.9 M²KITCHEN60.5 M²TERRACEAAGROUND FLOOR PLAN1:100051020 MN8 4006 0007 2006 0008 4008 40044 4006 0007 2007 20020 400
FIG. 02 — Fonderie Nord Offices, ground floor plan1:100

None of this is nostalgia. The same plan lives in a model on a server, and the contractor builds from that. But the model is where a decision is recorded. The pencil drawing is where it gets made.

On site

The test of a drawing is whether the building can be read the same way. Stand in the finished room with the section in your hand and you should be able to find the line you drew.

IMG. 01 — the same view, built2023

When that works, nobody notices. They just say the room feels right. We take that as the drawing doing its job.

Written by

Hana Okafor

Associate, project architect

Copenhagen

Hana runs projects from permit to handover and is usually the person on site. She joined in 2016 and became an associate in 2021.

Keep reading

[03]
  • Practice14 OCT 20267 min

    Drawing is how we think

    Why the section comes before the plan in our studio, and what a line can decide that a sentence cannot.

  • Process02 SEP 20265 min

    Why we still build models at 1:50

    A model is slow, expensive and impossible to email. It is also the only drawing a client reads without help.

  • Materials05 JUN 20266 min

    Timber that weathers well

    Larch, chestnut and charred pine after five winters. A field report with photographs and moisture readings.